Maintaining your communication network is important because there are many factors that can go wrong on a daily basis. Regular maintenance can keep the big problems away, while helping to maintain your networks optimal performance. At Electroscon Sdn Bhd (ESB) our engineers are also specific and specialised in the preventive and corrective maintenance of facilities and communication networks services. If necessary, our teams work to maintain or repair your network and also perform maintenance operations on active equipment.
Our service in maintenance includes:
- Maintenance of the copper network: local loop, terminal line.
- Supervision of fibre-optic networks by means of integrated management tools.
- Maintenance of telephone systems infrastructures.
- Maintenance of fixed, ADSL telecommunication networks.
CLIENTS:
PROJECT HIGHLIGHTS:
NO | CLIENT | PROJECT TITLE | AGREEMENT VALUE (RM) | YEAR AWARD | COMPLETION YEAR |
1 | Telekom Malaysia Berhad (TM Malaysian Logistics) | Rakan Rangkaian For Development And Maintenance For Telekom Malaysia | RM40,988,000.00 | 1st. Oct., 2018 – | 31st. Dec., 2021 |
2 | Telekom Malaysia Berhad (TM Malaysian Logistics) |
Pilot Project Batu Tiga Recovery Cables Ibusawat Telekom Malaysia Berhad, Batu Tiga, Shah Alam, Selangor | RM167,040.17 | 17th. Jul., 2014 | 29th. Aug., 2014 |
3 | Universiti Malaya | Pembelian bagi merekabentuk, membangun, menghantar, memasang, menguji, mentauliah, menyelenggara sistem maklumat pengurusan Universiti Malaya (UMMIS) serta perisian dan perkakasan | RM400,000.00 | 2007 | 2008 |
4 | Time Wireless Sdn Bhd/ Datapuri Sdn Bhd | The Design, Construction, Supply, Installation, Testing and Commissioning, Completion and Maintenance of Base Transceiver Station BTS Including Site Acquisition and Integration, Throughout Malaysia | RM2,784,470.00 | 2001 | 2004 |
5 | Time Wireless Sdn Bhd | The Design, Construction, Supply, Installation, Testing and Commissioning, Completion and Maintenance of Base Tranceiver Station BTS Including Site Acquisition and Intergration, Throughout Malaysia | RM620,383.52 | 2000 | 2000 |
6 | Time Wireless Sdn Bhd | The Design, Construction, Supply, Installation, Testing and Commissioning, Completion and Maintenance of Base Tranceiver Station BTS Including Site Acquisition and Intergration, Throughout Malaysia | RM609,816.85 | 2000 | 2000 |
7 | Time Automation and Mgt Services Sdn Bhd | PLUS maintenance of Data Network and Telecommunication Equipment | RM6,400,000.00 | 1st. Jan., 1996 | 31st. Dec., 1997 |
8 | Petronas Carigali Sdn Bhd | Provision of Equipment and and Engineering Services to Upgrade/replace the digital Microwave Radio Link System in Duyung | RM2,200,000.00 | Jun-95 | Dec-95 |