With Electroscon Sdn Bhd (ESB), you have an expert delivery partner in telecommunication infrastructure. Since 1983, when we were awarded contracts by the Country Telecommunication Authority – Jabatan Telekom Malaysia, ESB has been delivering results for telecommunications companies, installing internal, underground and aerial telecommunications infrastructure for even the most technically and physically challenging projects. We have all the abilities and resources to get your job done efficiently.
ESB offers a comprehensive range of civil works associated with telecommunication of network construction. Our services includes:
- Open trench work
- Supply & installation of HDD work
- Micro trenching
- Manhole precast & onsite installation
- Construction of pier crossing
NO | CLIENT | PROJECT TITLE | AGREEMENT VALUE (RM) | YEAR AWARD | COMPLETION YEAR |
1 | Telekom Malaysia Berhad (TM Malaysian Logistics) | Rakan Rangkaian For Development And Maintenance For Telekom Malaysia | RM40,988,000.00 | 1st. Oct., 2018 | 31st. Dec., 2021 |
2 | Syarikat Ismail Ibrahim Sdn Bhd | Supply, Delivery, Installation, Testing and commissioning for the Changes of Existing Telekom Overhead Pole to Underground Cabling (SERENE HEIGHT) | RM590,420.00 | 26th. Jun., 2019 | 31st. Aug., 2019 |
3 | TSH (M&E) Sdn Bhd | Cadangan Pembinaan Jejambat Daripada Cadangan Pembangunan Youcity Ke Lebuhraya Grand Saga Dan Menaiktaraf Jalan Kinabalu Jalan Kijang, Jalan Taman Suntex Di Mukim Cheras, Daerah Hulu Langat, Selangor Darul Ehsan | RM900,000.00 | 25th. Aug., 2017 | 30th. Sept., 2018 |
4 | ZELAN Construction Sdn Bhd | Projek penswastaan lebuhraya bertingkat Sungai Besi-Ulu Kelang Package Suke-cb2 – construction and completion of mainline and other associated works | RM1,062,795.00 | 23rd. Aug., 2017 | 23rd. Jul., 2018 |
5 | Sunway Construction Sdn Bhd | Projek Mass Rapid Transit Laluan 2: Sungai Buloh-Serdang-Putrajaya Package V201:Construction and Completion of Viaduct Guideway and Other Associated Works From Sungai Buloh – Persiaran Dagang – MRT – Pkg V201 | RM15,259,693.30 | 30th. Jun., 2016 | 16th. Oct., 2017 |
6 | Telekom Malaysia Berhad | Network Delivery Projects via Schedule of Rate (“JKH”) for Telekom Malaysia Berhad | RM66,710,119.00 | 01st. Oct., 2015 | 30th. Sept.. 2018 |
7 | WD Infra Sdn Bhd | Cadangan Pembangunan Bercampur Di atas Lot 1990, 1996, 25301 & 25310 Mukim Semanyih, Daerah Hulu Langat, Selangor (Kajang East) -Telephone underground services for proposed upgrading of Existing Jalan Kemuning to Jalan Semenyih | RM1,005,255.00 | 25th. June, 2015 | Nov., 2017 |
8 | Binaform Sdn Bhd / Sunway Construction Sdn Bhd | Proposed Widening to Existing Expressway at KM 750M to 2150M at E-10 Lebuhraya Baru Pantai – TM Cabling Relocation Works | RM920,000.00 | 03rd. Mar., 2015 | 05th. Aug., 2016 |
9 | Sunway Construction Sdn Bhd | Projek Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh-Kajang Package V4:Construction and Completion of Viaduct Guideway and Other Associated Works From Section 17 to Semantan Portal | RM16,951,854.91 | 20th. Mar., 2013 | 2nd. Feb., 2015 |
10 | Sunway Construction Sdn Bhd | Projek Bas Rapid Transit – Proposed Design, Construction, Completion and Commissioning of 1) Guideway & Halts; 2) Depot; 3) Park N Ride; And 4) Mechanization of Oxidation Pond of The Bus Rapid Transit (BRT) – Sunway Line | RM217,933.40 | 2nd. Sept., 2013 | 15th. May, 2014 |
11 | Simfoni Dunia Sdn Bhd | Cotract for Telecom Civil and Cable Migration Works at Jalan Kemuning, Semenyih, Selangor | RM126,808.09 | 6th. Jul., 2014 | 11th. Sept., 2014 |
12 | Syarikat Muhibah Perniagaan & Pembinaan Sdn Bhd |
Projek Mass Rapid Transit – Package MSPR9 : Construction and Completion of Multi Storey Car Park Building, External Works and Associated Works at Kajang Station | RM106,601.76 | 13th. Nov., 2013 | 17th. Dec., 2013 |
13 | Telekom Malaysia Berhad | Contract for Network Development Projects VIA Schedule Rate (JKH) for Telekom Malaysia Berhad (“TM”) – Tambah Nilai Kontrak | RM2,500,000.00 | 1st. Jul., 2009 | 30th. Jun., 2012 |
14 | Telekom Malaysia Berhad | Perlakasanaan Projek Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM52,470,000.00 | 1st. Jul., 2009 | 30th. Jun., 2012 |
17 | Telekom Malaysia Berhad | Perlakasanaan Projek Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM10,000,000.00 | 10th. Mar., 2009 | 9th. Mar., 2011 |
18 | Telekom Malaysia Berhad | Perlakasanaan Projek Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM10,000,000.00 | 17th. Apr., 2008 | 16th. Apr., 2010 |
19 | Telekom Malaysia Berhad | Perlakasanaan Projek Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM5,000,000.00 | 17th. May, 2007 | 16th. May, 2008 |
20 | WCT Construction Sdn Bhd | Proposed Construction and Completion of Guthrie Corridor Expressway on Design and Build Basis – Pipe Jacking Works | RM160,000.00 | 12th. Jul., 2007 | 12th. Jul., 2008 |
21 | Fiberail Sdn Bhd | The Installation of Second Fibre Optic Cable Along the Railway Corridor of Keretapi Tanah Melayu Berhad Between Kuala Lipis and Gua Musang | RM2,998,170.24 | 2004 | 2006 |
22 | Guthrie Corridor Expressway Sdn Bhd | The supply, Delivery, Installation, Testing and Commissioning of Fiber Optic Cable, Copper Cable and Power Cable along Guthrie Corridor Expressway | RM881,822.96 | 2004 | 2005 |
23 | Guthrie Corridor Expressway Sdn Bhd | The proposed construction and completion of Guthrie Corridor Expressway on design and build basis. Design and build for supply, installation, testing and commissioning of main ducting works basis. | RM1,742,918.90 | 01st. Aug., 2002 | ’01st. Mar., 2005 |
24 | Telekom Malaysia Berhad | Perlakasanaan Projek Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM15,000,000.00 | 10th. Aug., 2001 | 31st. Jul., 2006 |
25 | Time Wireless Sdn Bhd/ Datapuri Sdn Bhd | The Design, Construction, Supply, Installation, Testing and Commissioning, Completion and Maintenance of Base Transceiver Station BTS Including Site Acquisition and Integration, Throughout Malaysia | RM2,784,470.00 | 2001 | 2004 |
26 | Time dot com | Outside Plant Civil Works for Pasir Gudang Industrial Area Package 2 | RM360,744.40 | 2001 | 2001 |
27 | Fiberail Sdn Bhd | Provision of Engineering Services for testing and commissioning of Fiber Optic Network along the R.O.W of KTMB | RM350,000.00 | 2000 | 2000 |
28 | Time Wireless Sdn Bhd | The Design, Construction, Supply, Installation, Testing and Commissioning, Completion and Maintenance of Base Tranceiver Station BTS Including Site Acquisition and Intergration, Throughout Malaysia | RM620,383.52 | 2000 | 2000 |
29 | Time Wireless Sdn Bhd | The Design, Construction, Supply, Installation, Testing and Commissioning, Completion and Maintenance of Base Tranceiver Station BTS Including Site Acquisition and Intergration, Throughout Malaysia | RM609,816.85 | 2000 | 2000 |
30 | Bombadier (M) Sdn Bhd | Kuala Lumpur Light Rail Transit System (LRT) Install and Commissioning of Telecommunication System, System 2 | RM9,100,000.00 | 1997 | 1999 |
31 | ABB Daimler Benz (Projects) Sdn Bhd | Kuala Lumpur Light Rail Transit System (LRT) Design, Supply, Install and Commissioning of Telecommunication System, System 1 Phase 2 | RM3,998,000.00 | 1997 | 1998 |
32 | Teknolite Sdn Bhd | Engineering, Procurement, Construction and Commissioning of Fibre Optic Transmission Network of PACKAGE II & III for Celcom Petro Network (M) Sdn Bhd | RM12,890,000.00 | 1st. Dec., 1996 | ‘1st., Jun., 1997 |
33 | Telekom Malaysia Berhad | Perlaksanaan Project Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM50,000,000.00 | 15th. April, 1995 | 14th. April, 2000 |
1st Contract – K 1098/91 | RM15,000,000.00 | Jan., 1990 | Dec., 1991 | ||
2nd Contract – K 1031/93 | RM15,000,000.00 | Jan., 1992 | Dec.,1992 | ||
3rd Contract – K 1028/93 | RM50,000,000.00 | Jul., 1993 | Mar.,1995 | ||
4th Contract – K 1066/95 | RM50,000,000.00 | Apr., 1995 | Apr., 2001 | ||
34 | Telekom Malaysia Berhad | Perlaksanaan Project Rangkaian Tempatan TMB Secara Sistem Jadual Kadar Harga | RM180,000,000.00 | 15th. Apr., 1995 | 14th. Apr., 2000 |
35 | Fiberail Sdn Bhd | Provision of Engineering Services – for testing and commissioning of Fiber Optic Network | RM1,500,000.00 | 07th. Nov., 1995 | 6th. May, 1996 |
– Gemas – Tampin | RM1,495,000.00 | Aug., 1995 | Oct., 1995 | ||
– Sedenak – Kluang | RM400,000.00 | Sep., 1995 | Nov.,1995 | ||
– Rawang – Tg. Malim | RM600,000.00 | Dec., 1995 | Feb., 1996 | ||
– Paloh – Kluang | RM800,000.00 | Mar., 1996 | May, 1996 | ||
– Kluang – Layang-Layang | RM800,000.00 | Mar.,1996 | May, 1996 | ||
– Kampas – Pasir Gudang | RM700,000.00 | Mar., 1996 | May, 1996 | ||
– Bukit Mertajam – Taiping | RM1,800,000.00 | May, 1996 | Sept., 1996 | ||
– KT 007/96 North – South | RM1,000,000.00 | Apr., 1996 | Oct., 1996 | ||
– KT 015/96 – Northern | RM1,500,000.00 | Jun., 1996 | Dec., 1996 | ||
36 | Time Automation & Management Services/ Kembang Maju Sdn Bhd | Turnkey Contract Concept – Design, Supply, Testing and Commissioning of Local Telecommunication Network For K. Trengganu – Kota Bharu | RM19,260,000.00 | Nov., 1995 | Feb., 1996 |
37 | Binariang Sdn Bhd | Supply of Materials, Delivery to Site, Installation, Testing and Commissioning of Duct Insfrastructure Network for Scheme Subang | RM5,583,069.33 | 1st. Oct., 1995 | 1st. Oct., 1996 |
38 | Celcom Transmission (M) Sdn Bhd | Planning, Design and Project Management Services of Civil Inftrastructure Fibre Optic Metro Network Klang Valley Link – Johor Metro | RM4,040,535.55 | 1st. Sept., 1995 | 1996 |
39 | Time Salam/Time Automation & Management Services (TAMS) | The Construction of Manholes. Laying of Ducts and Other and Other Related Works Including Installation of Fibre Optic Cables for Time Telecommunications Sdn Bhd | |||
– Petaling Jaya | RM1,700,000.00 | Jun., 1995 | Dec., 1995 | ||
– Melaka | RM1,200,000.00 | Sep., 1995 | Dec., 1995 | ||
– Johor Bharu | RM600,000.00 | Sep., 1995 | Dec., 1995 | ||
40 | Time Automation & Management Services/ Teknik Naga Sdn Bhd | Turnkey Contract Concept – Design, Supply, Testing and Commissioning of Local Telecommunication Network For Kuantan – Dungun | RM15,500,000.00 | Sept., 1995 | Dec., 1995 |
41 | Time Automation & Management Services/ Teknik Naga Sdn Bhd | Turnkey Contract/Concept – Design, Supply, Testing and Commissioning of Local Telecommunication Network For Segamat – Gambang Link | RM14,454,000.00 | Sept., 1995 | Dec., 1995 |
42 | Kembang Maju Sdn Bhd | Time telecommunication Network Project – Turnkey contract for the engineering and construction of proposed duct route for fibre optic cable infraworks, cable installation, testing, commissioning and handing over from Kuala Terengganu to Kota Bharu | RM19,260,000.00 | Sept., 1995 | Dec., 1995 |
43 | AEG Westinghouse (M) Sdn Bhd | Kuala Lumpur Light Rail Transit System (LRT) Design, Supply, Install and Commissioning of Telecommunication System | RM2,537,000.00 | 20th. Jul.,1994 | 1996 |
44 | Time Engineering/PLUS | Supply, Installation and Commissioning of Telecommunication System using Optical Fiber Cable along North-South Expressway | RM80,000,000.00 | 1st. Dec., 1991 | 1st. Oct., 1994 |
45 | Telekom Malaysia Berhad | Contract for the supply of corrugated subduct HDPE | RM5,867,000.00 | 1994 | 1996 |
46 | Time Engineering/PERCON | Rehabilitation of Civil Work for Kuala Lumpur – Seremban Expressway | RM3,200,000.00 | Oct., 1991 | Dec., 1992 |
47 | JTM/Telekom Malaysia Berhad (TMB) | Overview Planning, Demand Forecast, Fundamental Planning, Detail Design and Supply, Install, Testing and Commissioning of Local Telecommunication Network by Turnkey System | RM636,000,000.00 | 1st. Oct., 1983 | 31st. Dec., 1988 |